Lower crankcase kit for condensing boilers - Immergas - Abitare

Lower crankcase kit for condensing boilers - Immergas

Codice IM3.027341

Lower crankcase kit for condensing boilers - Immergas 

High quality

Choose quality products on staging22.gdsystem.it, we will be ready to satisfy your every need!

Immergas crankcase kit

INSTALLATION.

Remove the lower grille (if present) (pos. 1, Fig. 1) by unscrewing the two screws (pos. 2, Fig. 1). Fit the lower casing kit by assembling the right side (pos. 3, Fig. 1) and the left side (pos. 4, Fig. 1) to the front casing (pos. 5, Fig. 1) with the screws (pos. 6, Fig. 1), using the pre-arranged drilling. N.B.: for TT, Tera and Victrix Hybrid series boilers, use the drilling on the side casings (pos. 7, Fig. 1) while for Victrix Exa series boilers, use the drilling (pos. 8, Fig. 1). Attention: the side with boss (pos. 3, Fig. 1) must always be mounted on the right side when looking at the boiler from the front, as shown in Fig. 1. Finally, fix the lower casing kit to the boiler using the screws (pos. 9, Fig. 1), supplied.

Immergas

We produce over 300 thousand boilers a year and market domestic heating and cooling appliances in 50 countries around the world, with twelve commercial branches in Europe and two in Asia. For more than twenty years, we have been developing the "Green Approach" philosophy with conviction: we study each appliance right from the design stage to reduce consumption and harmful emissions, we increasingly propose hybrid and heat pump-only systems to make the most of renewable energy. The photovoltaic system located on the roofs of our factories allows us to cover almost all of our energy needs and the close collaboration with universities such as that of Pisa guarantees a scientific approach in the analysis and development of advanced solutions.

PRODUCT CODEIM3.027341

Quantity
Prezzo €102.00 Tax included
Shipping costs: €0.00
Delivery time in Italy: 24/48 h*
Delivery time in Europe: 48/72 h*
*times may vary depending on shipping.